Fiber Optic Splice Closure
Product Name: Air-blowing Micro Cable
Fiber Type: Singlemode,Multimode,om1,om2,om3
Fiber Count: 2-24 Core
Outer Sheath Material: PE,HDPE,MDPE,LSZH
Applications: Reconstruction of old power lines and low voltage level lines. Coastal chemical industrial areas with heavy chemical pollution
Applicable Voltage Range: Power lines with voltage level of 220KV and below
This Installation Manual suits for the Fiber Optic Splice Closure (Hereafter abbreviated as FOSC), as the guidance of proper installation.
The scope of application is: aerial, underground, wall-mounting, duct-mounting and handhole- mounting. The ambient temperature ranges from –40℃ to +65℃.
The process of installing FOSC
1. Step One - Open the closure
① Cleaning the locale and determine where to install the FOSC and then place fiber cables required.
② Check whether the main components and accessories have been well prepared inside the package
③ Open the closure
- Demount hoop fixing bolt and pull hoop locking system out, then proceed in demounting the hoop.
- Pull the FOSC cover upwards out, installation could begin.
④ See Drawing 1
Important issues:
- If the weather condition is not good enough, then a tent must be pitched for waterproof and dustproof. ;'
Reviews
There are no reviews yet.